Skip to content

Gallery

From the surface station to the seabed.

Field photography from active projects.

Diver following a laid line during a shallow-water inspection.
Diver following a laid line during a shallow-water inspection.
Floated line positioned along a rock trench on the shore approach.
Floated line positioned along a rock trench on the shore approach.
Amphibious excavator on station in the shallows during nearshore works.
Amphibious excavator on station in the shallows during nearshore works.
Floated line under tow at first light. Surface floats hold the section before controlled lay-down.
Floated line under tow at first light. Surface floats hold the section before controlled lay-down.
Cable handling spread on the lay barge. Deck crane and rigging positioned ahead of a floated section.
Cable handling spread on the lay barge. Deck crane and rigging positioned ahead of a floated section.
Recovered pipe section lifted to deck. Heavy marine growth after service on the seabed.
Recovered pipe section lifted to deck. Heavy marine growth after service on the seabed.
HDD shore approach. Pipe string prepared at the punch-out point.
HDD shore approach. Pipe string prepared at the punch-out point.
Flange coupling made up between new and recovered pipe sections.
Flange coupling made up between new and recovered pipe sections.