Skip to content

Projects

Selected work across the Gulf and Red Sea.

From 30 km cable lays to emergency cooling pump repairs, our project record reflects the range of subsea conditions we operate in.

  • Project 012023

    ECE Offshore

    Subsea cable laying

    Red Sea

    Scope
    30 km of subsea cable laying using Trimix diving and floating buoys.
    Outcome
    Full route deployed under strict HSE controls with full technical oversight.
  • Project 022023

    World of Oceans Investment Group

    Cable recovery

    Shibara Island, Red Sea

    Scope
    Recovery of 6 km internet cable from 55 m seabed depth, combining Trimix and saturation diving.
    Outcome
    Cable recovered intact, project closed without dive incident.
  • Project 032024

    Hengtong Group

    Articulated padding installation

    9-5 Island, Red Sea

    Scope
    1,400 m of articulated padding installed on subsea cable and bolted to rock anchors.
    Outcome
    Long-term cable protection achieved across challenging seabed.
  • Project 042024

    Geometra International

    Camera deployment

    Red Sea

    Scope
    Deployment of inspection cameras for trench routing across 2 km of seabed.
    Outcome
    Trench routing data delivered to project engineers on schedule.
  • Project 052024

    Geometra International

    Inspection and marking

    Madaya and Farasan

    Scope
    2 km of seabed inspection and marking points for downstream works.
    Outcome
    Marked corridor signed off for follow-on installation.
  • Project 06

    AlGihaz Contracting

    Structural welding and dredging

    Yanbu

    Scope
    Subsea trench dredging, structural welding and cable integration.
    Outcome
    Completed safely and on schedule, supporting major transmission works.
  • Project 07

    Scorpion Arabia

    Pipeline HDD punch-out

    Eastern Province

    Scope
    Subsea support for punch-out of six pipeline horizontal directional drill paths.
    Outcome
    Clean execution with zero misalignment during pull-through.
  • Project 08

    Bluegrass Company

    Drill-head recovery

    Offshore Gulf

    Scope
    Dredged and extracted a 1.5 m buried drill head from rocky seabed.
    Outcome
    Tool recovered intact, site cleared for resumed boring operations.
  • Project 09

    Confidential industrial facility

    Emergency cooling pump repair

    Scope
    Identified and repaired a submerged pump failure during live operations.
    Outcome
    Cooling flow restored within 24 hours, full shutdown avoided.
  • Project 10

    Port of Jeddah

    Ship interior and hull cleaning

    Scope
    Internal cleaning of vessel hull and fouled components.
    Outcome
    Vessel passed inspection and recertified with zero docking delays.
  • Project 11

    Eastern Province

    Undersea mine and explosive detection

    Scope
    Diver-led detection and clearance of submerged threats.
    Outcome
    Area signed off for safe marine construction.