Projects
Selected work across the Gulf and Red Sea.
From 30 km cable lays to emergency cooling pump repairs, our project record reflects the range of subsea conditions we operate in.
- Project 012023
ECE Offshore
Subsea cable laying
Red Sea
- Scope
- 30 km of subsea cable laying using Trimix diving and floating buoys.
- Outcome
- Full route deployed under strict HSE controls with full technical oversight.
- Project 022023
World of Oceans Investment Group
Cable recovery
Shibara Island, Red Sea
- Scope
- Recovery of 6 km internet cable from 55 m seabed depth, combining Trimix and saturation diving.
- Outcome
- Cable recovered intact, project closed without dive incident.
- Project 032024
Hengtong Group
Articulated padding installation
9-5 Island, Red Sea
- Scope
- 1,400 m of articulated padding installed on subsea cable and bolted to rock anchors.
- Outcome
- Long-term cable protection achieved across challenging seabed.
- Project 042024
Geometra International
Camera deployment
Red Sea
- Scope
- Deployment of inspection cameras for trench routing across 2 km of seabed.
- Outcome
- Trench routing data delivered to project engineers on schedule.
- Project 052024
Geometra International
Inspection and marking
Madaya and Farasan
- Scope
- 2 km of seabed inspection and marking points for downstream works.
- Outcome
- Marked corridor signed off for follow-on installation.
- Project 06
AlGihaz Contracting
Structural welding and dredging
Yanbu
- Scope
- Subsea trench dredging, structural welding and cable integration.
- Outcome
- Completed safely and on schedule, supporting major transmission works.
- Project 07
Scorpion Arabia
Pipeline HDD punch-out
Eastern Province
- Scope
- Subsea support for punch-out of six pipeline horizontal directional drill paths.
- Outcome
- Clean execution with zero misalignment during pull-through.
- Project 08
Bluegrass Company
Drill-head recovery
Offshore Gulf
- Scope
- Dredged and extracted a 1.5 m buried drill head from rocky seabed.
- Outcome
- Tool recovered intact, site cleared for resumed boring operations.
- Project 09
Confidential industrial facility
Emergency cooling pump repair
- Scope
- Identified and repaired a submerged pump failure during live operations.
- Outcome
- Cooling flow restored within 24 hours, full shutdown avoided.
- Project 10
Port of Jeddah
Ship interior and hull cleaning
- Scope
- Internal cleaning of vessel hull and fouled components.
- Outcome
- Vessel passed inspection and recertified with zero docking delays.
- Project 11
Eastern Province
Undersea mine and explosive detection
- Scope
- Diver-led detection and clearance of submerged threats.
- Outcome
- Area signed off for safe marine construction.